BP2016-253 6/21/17 19915 GB 253 Ashton Tampa Res. Pass Partial 10 columns Columns
PL2017-051 6/21/17 19710 GB 502 Roy J Schleman Plumbing Pass Final Bldg Inspection on General Contractor Permit Approved by Greg Y. Final
EL2017-140 6/21/17 19531 GB 201 Buttmi Construct. Pass   Electrical Rough-In
BP2017-140 6/21/17 19531 GB 201 Buttmi Construct. Pass   Framing
BP2016-291 6/21/17 19451 GB 606 Shutter-Me-Up Fail Left VM for Randy; Tom was not able to let him in. Reschedule - $25 fee. Final Storm Shutters
EL2017-030 6/21/17 19418 GB 402 Mike's Electric Pass   Final
BP2017-098 6/21/17 19418 GB 402 Seating Constructors USA Pass   Final
PL2017-053 6/21/17 19418 GB 402 Plumbing By Paul LLC Pass   Final
MC2017-065 6/22/17 19418 GB 402 Piper Fire Protection Pass Marshall Eiss approved Fire Sprinkler Final
MC2017-090 6/19/17 20110 GB 301 Air Hawk Heating & Cooling Pass   AC Final
PL2017-056 6/19/17 19931 GB D4 R. Carr, Inc. Pass Master Bath Shower pan & tub
EL2017-047 6/19/17 19931 GB D4 DiMond Electric Pass Master Bath Electrical Final
MC2017-081 6/19/17 19424 GB 202 Hylan Air Condition/Htg. Pass   AC Final
BP2017-146 6/19/17 19222 GB Building Sunwest Construct. Pass   Roof Final
MC2017-041 6/19/17 19222 GB 605 Air Source Coolg & Htg. Pass   AC Final
MC2017-084 6/19/17 18650 GB 501 Paradise Air Pass   AC Final
MC2016-094 6/19/17 18500 GB 502 Fast of FL Pass   AC Final
MC2016-116 6/19/17 18500 GB 408 Fast of FL Pass   AC Final
MC2017-014 6/16/17 19925 GB 206 Fast of FL Pass   AC Final
BP2016-253 6/16/17 19915 GB Blg 8
Ashton Tampa Res.

Pass Reinspect - Balance of Bond beam; provide Threshold Inspection Report. Bond Beam
BP2017-061 6/16/17 19915 GB 604 Ashton Tampa Res. Pass   Building Final
BP2017-059 6/16/17 19915 GB 602 Ashton Tampa Res Pass   Building Final
BP2017-058 6/16/17 19915 GB 601 Ashton Tampa Res Pass   Building Final
BP2017-062 6/16/17 19915 GB 605 Ashton Tampa Res. Pass   Building Final
BP2017-107 6/16/17 19701 GB 323 Martin & Wilson Corp. Pass   Electrical Rough-In/Drywall Screw
MC2017-082 6/16/17 19531 GB 406 Pinellas Comfort Systems Pass   AC Final
BP2017-119 6/16/17 19500 GB Affordable Aluminum Construct. Pass   Guardrails Final
BP2017-149 6/16/17 18602 GB Wright Way Consultg. Pass   Final
BP2017-107 6/9/17 19701 GB 323 Martin & Wilson Corp Pass   Shower pan & tub
BP2017-125 6/9/17 19607 GB 203 Deslandes Design Build Pass   Drywall screw
BP2017-122 6/9/17 19607 GB 102 Deslandes Design Build Pass Side A Shower pan & tub
BP2017-115 6/9/17 19531 GB 602 Mid Florida Services Pass   Framing
PL2017-048 6/9/17 19531 GB 602 Mid Florida Services Pass   AC Final
BP2017-140 6/9/17 19531 GB 201 Buttmi Construction Pass   Plumbing 2nd Rough
MC2016-132 6/9/17 19105 Whispering Pines Dr. Fast of FL - AC Fail No Answer at door or by phone; no car in drive. Addl Fee $25 reinspect. AC Final
MC2017-048 6/7/17 20040 GB 505 Landers Air Conditioning Pass   AC Final
MC2017-074 6/7/17 20002 GB 2405 Landers Air Conditioning Pass   AC Final
BP2017-120 6/7/17 19627 GB 102 Ace Remodeling Pass   Building Final
PL2017-054 6/7/17 19627 GB 102 Joe Cool Home Services Pass   Plumbing replace tub
BP2016-253 6/7/17 19915 GB Ashton Woods Fail Per Fig 403.1 FBC-Residential - a minimum of 1-1/2" is req'd for coverage of steel. Beam - 8 units
BP2017-101 6/7/17 19531 GB 516 RollShield  Pass   Windows Final
BP2017-099 6/7/17 19010 GB F'Deluca Construct. Pass   Siding Framing
BP2016-332 6/7/17 18500 GB 407 Ultra Custom Outdoor Living Spaces Pass   Tile Final
BP2016-275 6/5/17 19915 GB Ashton Woods Fail Multiple Units Multiple Finals
BP2016-275 6/5/17 19400 GB Don Hatch Pass   Drywall Screw and Framing for Partial Windows
MC2017-073 6/5/17 19201 Vista Lane Unit B3 United AC Pass   AC Final
BP2017-125 6/2/17 19607 GB 203 Deslandes Design Build Pass   Insulation
PL2017-055 6/2/17 19607 GB 202 Pinellas Plumbing Pass   Shower pan and tub; Plumbing rough approval
EL2017-032 6/2/2017 19607 GB  James Electric of TB Pass   Add 3 car chargers Final
PL2017-055 6/2/2017 19607 GB 103B Pinellas Plumbing Pass B side only Shower pan and tub
PL2017-055 6/2/2017 19607 GB 102B Pinellas Plumbing Pass B side only Shower pan and tub
BP2017-114 6/2/17 19710 GB 402 Armortech Windows and Doors Inc Pass   Door
EL2017-046 6/2/17 19910 GB B&B Electrical Solutions Inc Pass   Panel C/O Final
MC2016-129 6/2/17 19440 GB 309 Hylan Air Cond. & Htg. Pass   AC Final
BP2015-225 6/2/17 19130 GB V-1 Down Under Construction Services Inc Pass   Plumbing
MC2017-076 6/2/17 18450 GB 504 Hylan Air Cond. & Htg. Pass   AC Final
BP2017-071 6/2/17 20002 GB 2205 Clear Choice Windows and More Inc Pass   Door Final
BP2017-143 6/2/17 19937 GB A2 Lowes Home Centers LLC Pass   Countertop Final
BP2017-102 6/2/17 20019 GB D.W. Quick Construction Services Pass   Drywall Screw and channel, Columns, Beams/Posts
PL2017-056 6/2/17 19931 GB D4 R. Carr Inc Pass   2nd Rough Shower Pan
BP2017-086 6/2/17 19701 GB 216 Clear Choice Windows and More Inc Pass   Window Final
Aloha Bay Condo 6/2/17 19607 GB Deslandes Build Inc Pass Multiple Units Multiple Inspections
PL2017-050 6/2/17 19531 GB 417 MId-Florida Pass   R/I Plumbing
BP2017-113 6/2/17 19531 GB 316 Creative Builders by Bill Thomas Pass   Drywall Screw
MC2017-076 6/2/17 18450 GB 504 Hylan AC and Heating Pass   AC Final
BP2016-356 6/2/17 18328 GB Seaside Seabird Sanctuary Pass   New Pelican and new entrance sign Final
BP2017-035 6/1/17 19710 GB 501 Piper Fire Prot. Fail Call for results Fire Sprinkler
PL2017-056 5/31/17 19931 GB 056 R. Carr, Inc. Pass   Plumbing
PL2017-056 5/31/17 19931 GB D4 R. Carr, Inc. Pass   Plumbing 1st Rough
EL 17-047 5/31/17 19931 GB D4 R. Carr, Inc. Pass   Plumbing 1 tub shower, pan and kitchen sink.
MC2017-022 5/31/17 19710 GB 501 CGM Services Pass   Final
PL2017-009 5/31/17 19710 GB 501 Pinellas Plumbing Pass   Final
EL2017-008 5/31/17 19710 GB 501 Everingham Electric Pass   Electrical Final
BP2017-122 5/31/17 19607 GB 102 Deslandes Design Build Pass   Drywall Screw
BP2017-123 5/31/17 19607 GB 103 Deslandes Design Build Pass   Drywall Screw
BP2017-124 5/31/17 19607 GB 202 Deslandes Design Build Pass   Mechanical
BP2017-124 5/31/17 19607 GB 202 Deslandes Design Build Pass   Framing
BP2017-125 5/31/17 19607 GB 203 Deslandes Design Build Pass   Framing
BP2017-125 5/31/17 19607 GB 203 Deslandes Design Build Pass   Mechanical
EL2017-043 5/31/17 19607 GB 202 James Electric Pass   Electrical Rough-in
EL2017-043 5/31/17 19607 GB 203 James Electric Pass   Electrical Rough-in
PL2017-052 5/31/17 19020 GB 3 Plumbing Today Pass   Water heater Final
PL2017-057 5/31/17 19236 GB 501 Batton Plumbing Co Inc Pass   Water heater Final
BP2016-275 5/31/17 19400 GB Don Hatch Pass   Insulation
BP2017-008
5/31/17 19710 GB 501 Seabreeze Construction Services Inc Pass Multiple Inspections Building, Electrical, Plumbing, Mechanical Finals
BP2016-054 5/31/17 19816 GB Voeller Construction Pass Subject to Threshold inspection report. Columns poured Columns
BP2017-117 5/31/17 19931 GB D4 AAA Services of Central Florida Inc Pass Multiple Inspections Framing, Electric R/I, Plumbing R/I
EL2017-044 5/30/17 19531 GB 316 Electrical Expert, Inc. Pass   Electrical Rough-In
BP2017-113 5/30/17 19531 GB 316 Creative Builders by Bill Thomas Pass Sub:  Expert Inc (Electric R/I Passed) Framing
MC2017-078 5/24/17 19440 GB 508 Hylan AC and Heating Pass   AC Final
BP2017-047 5/24/17 19531 GB 315 Betterview Windows and Shutter Inc Pass   Window Final
BP2016-054 5/24/17 19816 GB Voeller Construction Pass Sub: Scotto Plumbing Partial rough water main
BP2017-102 5/24/17 20019 GB D.W. Quick Construction Services Fail No Plans on site Columns, Beams/Posts
PL2017-045 5/24/17 19451 GB P8 Slaughter Plumbing Pass   Valve Final
PL2017-047 5/24/17 19417 GB D110 Scotto Plumbing Pass   Final shower pan/drain
BP2017-134 5/24/17 19417 GB D110 Carpet Barn & More Pass Sub:  Scotto Plumbing Tile Shower Final
BP2016-275 5/24/17 19400 GB Don Hatch Pass Sub:  Clearwater Gas Framing and Gas R/I
RF2017-006-009 5/24/17 19833-19839 GB Paul Sellers Roofing Pass 4 Permits Roof Finals
PL2017-055 5/22/17 19607 GB (#102 & #103) Deslandes Design Build Pass Except Shower Pan Rough-In
EL2017-043 5/22/17 19607 GB 102 James Electric of TB Pass   Electrical Rough-In
BP2017-123 5/22/17 19607 GB 103 Deslandes Design Build Pass   Framing
BP2017-123 5/22/17 19607 GB 123 Deslandes Design Build Pass   Mechanical
BP2017-122 5/22/17 19607 GB 102 Deslandes Design Build Pass   Mechanical
EL2017-043 5/22/17 19607 GB 103 James Electric of TB Pass   S. portion of S. Side
BP2017-099 5/22/17 19010 GB F'Deluca Construction Pass    
BP2017-099 5/22/17 19010 GB F'Deluca Construction Pass SouthWest portion of South Side Framing
MC2016-126 5/22/17 20110 GB 400 Hylan AC and Heating Pass   Final AC
BP2017-088 5/22/17 18650 GB 411 Rollshield LLC Pass   Shutter Final
BP2016-054 5/22/17 19816 GB Voeller Construction Pass Subject to Threshold inspection report Columns 6th floor to roof back half
PL2017-054 5/22/17 19627 GB 102 Joe Cool Pass   Plumbing Rough
BP2016-275 5/19/17 19400 GB Donald Hatch Fail SUB: Clearwater Gas, Top line pressure dropped from 15 to 10.9 Gas Rough In
BP2016-306 5/19/17 18610 GB 407 Rollshield LLC Pass   Final
PL2017-028 5/19/17 19534 GB 302 McGill Plumbing Pass   Final
BP2017-130 5/19/17 19201 Vista Lane D10 Robert A Ford III Pass   Siding/Dry In
PL2017-047 5/19/17 19417 GB D110 Scotto Plumbing Pass   Shower Pan & Tub
MC2017-075 5/19/17 19531 GB 603 Paradise Air Pass   AC Final
PL2017-053 5/19/17 19418 GB 402 Plumbing By Paul Pass   Plumbing Rough
MC2017-072 5/19/17 19748 GB Arctic Air Systems Pass   AC Final
RF2017-006-009 5/19/17 19833, 19835, 19837, 19839 GB Paul Sellers Roofing Pass   In Progress
BP2017-112 5/17/17 18522 GB RA Gonzalez Construction Pass   Siding Final
BP2017-089 5/17/17 18522 GB West Coast Fence Pass   Fence Final 
BP2017-129 & PL2017-051 5/17/17 19710 GB 502 Swenson Construction Pass SUB: Roy Schleman Plumbing Underlayment and Drywall/Durarock for master shower
BP2016-346 5/17/17 19937 GB C2 Flooring VIP Express Pass   Floor Final 
PL2017-047 5/17/17 19417 GB D110 Scotto Plumbing Fail No Water in Liner for Inspection Shower Pan
PL2017-051 5/15/17 19710 GB 502 Swenson Construction Pass SUB: Roy Schleman Plumbing Tub Set, Shower Pan and Valves
BP2017-014 5/15/17 20228 GB Suncoast Building Contractor Pass Note in file from P.E. Rebar/Columns
MC2016-133 5/15/17 19926 GB Fast of Florida Pass Multiple Inspections Mechanical Finals
WATERSIDE 5/15/17 19915 GB Ashton Woods Pass   Multiple Inspections
WATERSIDE 5/12/17 19915 GB Ashton Woods Pass/Fail Call for Results Multiple Inspections
BP2017-054 5/12/17 19816 GB Voeller Construction Pass   Drainage
BP2017-081 & EL2017-022 5/12/17 19450 GB 101 Rollshield LLC Pass SUB: August Electric Building and Electric Finals
PL2017-048 5/12/17 19531 GB 602 Mid-Florida Services Pass 2 Shower Pans Plumbing
PL2017-049 5/12/17 20000 GB 1002 Martin & Wilson Corporation Pass Shower Pan Plumbing
BP2017-083 5/10/17 20000 GB 1002 Martin & Wilson Corporation Pass "Tub Only" Shower pan will be called later
​Adding mechanical rough  
Shower pan and Tub
WATERSIDE 5/10/17 19915 GB Ashton Woods Pass Multiple Inspections Gas and Electrical Finals
MC2017-069 5/10/17 19829 GB 502 Ervin Air Inc Pass   E/C/O Final
BP2017-103 & PL2017-027 5/10/17 19717 GB V1 Morgan Exteriors Pass SUB: Independent Plumbing of Florida Building and Plumbing Final
MC2016-118 5/10/17 19451 GB 204 Fast of Florida Pass   E/C/O Final
BP2017-069 5/10/17 19010 GB F'Deluca Pass North End Only
​(East and West Req. another permit)
Siding Repair Final
PL2017-023 5/10/17 19204 GB Gasmasters Pass   Gas Final
WATERSIDE 5/8/17 19915 GB Building 6 Ashton Woods Multiple Inspections Call for results Finals:  Electrical Mechanical and Gas
BP2017-048 5/8/17 18650 GB 312 Practical Window and Doors Pass   Window Final
PL2017-043 5/8/17 19424 GB 201 FTP Plumbing LLC Pass   Water Heater Final
BP2016-054 5/5/17 19816 GB Voeller Construction Pass SUB: Scotto Plumbing Underground Sanitary
MC2017-012 5/5/17 18450 GB 102 Hylan AC Pass   Final
BP2017-082 & PL2017-022 5/5/17 19817 GB 104 Midway Services Pass   Building and Plumbing Final
RF2017-004 5/5/17 19235 GB Noreck Roofing Pass   Final
RF2017-005 5/5/17 202 192nd Ave A Old Time Roofing Pass   Final
BP2017-111 5/5/17 19807 GB 113 The Beach Building Company Pass   Final
PL2017-045 5/5/17 19451 GB 808 Slaughter Plumbing Pass   Tub Set
MC2017-051 5/3/17 20064 GB 3
Fast of Florida Pass Photos sent for Roof, Waiting for CBO approval Final A/H only
BP2017-073 5/3/17 19710 GB 404 Clear Choice Windows Pass   Final
BP2016-054 5/3/17 19816 GB Voeller Construction Pass SUB:  Scotto Plumbing. 1st floor 2" in Masonry walls Partial Plumbing Rough
BP2016-054 5/3/17 19816 GB Voeller Construction Pass   Elevator Stairwell #1 Shear wall 5th and 6th levels
PL2017-031 and 033 5/1/17 19915 GB Ashton Woods - Waterside Pass SUB: First Quality Plumbing
Unit 601 and 602
Plumbing Final
BP2016-054 5/1/17 19816 GB Voeller Construction Pass Balance of 5th floor columns Columns
MC2017-050 5/1/17 19418 GB 402 Air-Flo Erwood Pass   Mechanical Rough In
BP2017-098 5/1/17 19418 GB 402 Seating Constructors USA Pass ADD: Drywall Screw Framing
BP2016-275 5/1/17 19400 GB Donald Hatch Pass SUB: Gulf Coast Electric of Pinellas Electrical Rough In
BP2016-275 5/1/17 19400 GB Donald Hatch Pass ADD: Flashing Mechanical
RF2017-005 5/1/17 202 192nd Ave A Old Time Roofing Pass ADD: Flashing In progress
PL2017-029 5/1/17 19111 W.P.Dr J&R Premier Plumbing Pass   Final
BP2016-076 4/28/17 19113 W.P.Dr Swenson Pass   Electrical Final
PL2015-107 4/28/17 18400 GB 1414 Fast of Florida Pass   Final
PL2016-069 4/28/17 18400 GB 1207 Fast of Florida Pass   Final
PL2016-070 4/28/17 18400 GB 1314 Fast of Florida Pass   Final
EL2016-064 4/28/17 18720 GB Big Rovers Electric Pass   Final
BP2016-300 4/28/17 18720 GB Kancor Companies Pass   Final
BP2017-036 4/28/17 18720 GB Kancor Companies Pass   Final
BP2016-318 4/28/17 19823 GB 8 D&D Services of Tampa Bay Pass   Building and Plumbing Final
BP2017-083 4/28/17 20000 GB 1002        
EL2017-026 4/28/17 20000 GB 1002 Sunshine Electric of Pinellas Pass   Rough In
BP2017-104 4/28/17 18523 GB Unique Properties Pass Window and Framing ok Rough In
RF2017-004 4/28/17 19235 GB Noreck Roofing Pass   Underlayment
EL2017-030 4/28/17 19418 GB 402 Mikes Electric Pass   Rough In
EL2017-033 4/28/17 20044 GB A Buell Electric Pass   Final
BP2017-106 4/28/17 19807 GB The Beach Building Pass Deck Repair In Progress
BP2016-275 4/28/17 19400 GB Donald Hatch Pass Adding Wall Strapping Insp. Wall Sheathing
BP2016-275 4/26/17 19400 GB Donald Hatch Pass Approved as Noted: Seal corners of liner at each seat in showers Wall Sheathing
MC2017-035 4/26/17 19111 Vista Bay Dr Hale's A/C Service Inc Pass   Final
EL2017-027 4/26/17 19418 GB 106 All County Electric Inc Pass   Final
PL2017-027 4/26/17 19717 GB V1 Independent Plbg of FL Inc Pass Need water in pan Shower pan & Tub
BP2017-093-096 4/26/17 19701 GB UNITS 108,109,110,111 Bay Area DKI Pass ALL 4 UNITS FOR DEMO Final
RF2017-002 4/26/17 19531 GB McMullen Roofing Inc Pass   Roof Final
BP2017-065 4/26/17 19924 GB Precision Garage Door Service Pass   Final
MC2017-034 4/26/17 20228 GB ARS/Rescue Rooter Pass   Final
BP2016-054 4/26/17 19816 GB Voeller Construction Inc Pass Per Threshold inspector report Slab
PL2017-027 4/24/17 19717 GB V1 Independent Plbg of Fl Fail Not Ready Shower pan & tub
BP2016-054 4/24/17 19816 GB Voeller Construction Inc Pass Columns on Rear Half Columns
RF2017-003 4/24/17 19700 GB McMullen Roofing Pass   In Progress
BP2017-069 4/24/17 19010 GB F'Deluca Fail X 2 Nail and Nail spacing is not per Architect letter, 6"&8" spacing, actual spacing is 10"-11" o.c. Framing and House Wrap
EL2017-023 4/21/17 18650 GB Tyco Integrated Pass   Fire Alarm Final
BP2016-076 4/21/17 19113 W.P.Dr Swenson Fail Open Neutral Stairwell Electrical Final
BP2016-076 4/21/17 19113 W.P.Dr Swenson Pass   Building Final
BP2017-021 4/21/17 20000 GB Atlantic Tower Pass   Building & Electrical Final
BP2016-010 4/21/17 19915 GB Build # 6  Ashton Woods Pass   Underground Gas
BP2017-097 4/21/17 19701 GB 111 JB Group Pass   Drywall Screw
PL2017-025 4/21/17 19236 GB 504 Mid-Fla Pass   Shower pan & tub
BP2017-028-035 4/21/17 19607 GB Deslandes Design Pass   ALL UNITS Build & MEP'S
EL2017-028 4/19/17 19931 GB D4 Fast of Florida Pass   Final
BP2017-097 4/19/17 19701 GB 111 JB Group Pass   Drywall Screw
MC2016-150 4/19/17 19627 GB 201 Unique Services Pass   Final
MC2017-040 4/19/17 18522 GB E Preferred Mechanical Pass   Final
MC2016-112 4/14/17 19320 GB Air Turbulencia Pass    
BP2015-268 4/14/17 19520 GB 301 Tom Pici & Sons Pass   Final
BP2017-085 4/14/17 19700 GB 403 Overhead Door Clwtr Pass   Final
BP2017-079 4/14/17 19810 GB Rogers Home Repair Pass   Final
BP2017-078 4/14/17 19111 Vista Bay 304  Gaard Inc Pass   Building and MEP'S
MC2017-038 4/14/17 18610 GB 406 Unique Services Fail Not Ready Final
MC2017-039 4/14/17 18650 GB 103 Midway Services Pass   Final
BP2017-072 04/10/17 19701 GB 306 Weather Tite Windows Pass N/A Final
BP2016-226 04/10/17 19501 Gulf Blvd. Owner Pass    
RF2016-007 04/10/17 19501 Gulf Blvd. JD Contractors Pass    
MC2016-141 04/10/17 19501 Gulf Blvd. St. Pete Air Pass    
EL2016-087 04/10/17 19501 Gulf Blvd. Ecovolt Electric Pass    
PL2016-114 04/10/17 19501 Gulf Blvd. Cass Plumbing Pass    
BP2017-018 04/10/17 19501 Gulf Blvd. Owner Pass N/A  
BP2017-067 04/10/17
19501 Gulf Blvd.
Owner Pass    
BP2016-054 04/10/17 19816 Gulf Blvd. Voeller Construction Pass    
BP2017-051 4/10/17 19534 GB #101 Weather Tite Windows Pass